SENG, Nova Gorica, Slovenia |
Elaboration of project and technical documentation for Pumped Storage Plant Avče |
|
NATEL, Jeddah, Saudi Arabia |
Project documentation for S/S 110/13,8 kV MALISA, TAIF NORTH, NAGA - Base design, Detailed design, As built |
|
ELES - TSO, Ljubljana, Slovenia |
Study: Identification of possibility for implementation of information system for transmission infrastructure asset management |
|
EU 6th FRAMEWORK PROGRAMME |
Integrated project FENIX |
|
EU 6th FRAMEWORK PROGRAMME |
EIFN - Energy Sector Innovation - Financial Network |
|
RIKO d.d. (Investor: ELEM, Skopje, Macedonia) |
Project documentation and supply of electrical equipment for HPP Sv. Petka (on river Treska) |
|
BORZEN (Power Market Operator), Ljubljana, Slovenia |
Study: »Criteria for defining available quantities of transmission capacity for different periods« |
|
AQUAWATT, Žirovnica, Slovenia |
Small scale HPP Bukovje – Electrical design |
|
RIKO, Slovenia |
HPP S. Petka, Macedonia (on river Treska): Supply of electrical equipment |
|
DRAVSKE ELEKTRARNE MARIBOR, Slovenia |
Pumped storage Plant Kozjak: Power market study |
|
EU 6th FRAMEWORK PROGRAMME |
WIND on the GRID: An integrated approach within the framework of the specific research and tehnological development programme "integrating and Strenghtening the European Research Area (2002-2006) |
|
METAL RAVNE d.o.o., Ravne na Koroškem, Slovenia |
Engineering for S/S Kovačnica III and IIIA (project documentation, delivery, mounting, testing and commissioning 20 kV equipment – 20 kV switchgear; power transformers 20/0,4 kV, 2 MVA). |
|
KONČAR – Električni uređaji, Split, Croatia |
Engineering and supply “Unit controller in MCCs” for Pumped Storage Plant Avce |
|
ELEKTRO GORENJSKA , Kranj, Slovenia |
Project and technical documentation for S/S 110/20/6,3 kV Moste |
|
TE Brestanica, Brestanica, Slovenia |
Maintenance of information system in GPP Brestanica |
|
RADEČE PAPIR, Radeče, Slovenia |
Project documentation for crossing from S/S voltage 35 kV on 20 kV - Base, Licence project and Detailed design |
|
Elektro Primorska d.d., Nova Gorica, Slovenia |
Power quality monitoring aplication - upgrade |
|
EPCG, Nikšič, Republic of Montenegro |
Consulting services for construction of telecommunication system of EPCG |
|
ABB, Ljubljana, Slovenia |
Factory documentation for HPP Blanca 110 kV GIS |
|
ABB, Ljubljana, Slovenia |
Consulting and design for PPHP Avce – LOT EE – electrical equipment |
|
Elektro Gorenjska, Kranj, Slovenia |
Project documentation for S/S 110/20 kV Zelezniki |
|
NATEL, Jeddah, Saudi Arabia |
Project documentation for:
· High Voltage Makkah (Extension two 110 kV GIS Cable Feeder Bays)
· Makkah Power Station (Extension one Cable Feeder Bay)
· Malisa (Extension one Transformer Feeder Bay) |
|
Hermes Commerce, Ljubljana, Slovenia |
Project documentation for medium voltage cable connection between S/S Barje and S/S Vic |
|
Petrol Energetika Ravne, Ravne na Koroškem, Slovenia |
Project documentation (for construction); replacement of TR4 110/20 kV 20 MVA with TR 40 MVA and replacement of TR1 110/5 kV 10 MVA |
|
Javna agencija RS za energijo, Maribor, Slovenia |
Study: Regulation issues in exemption of new interconnector from obligations to provide a third party access |
|
UNIDO, Austrija |
Preparation of an Action Plan for National Energy Development Strategy for Montenegro |
|
TE-TOL, Ljubljana, Slovenia |
Project documentation (tender documentation, licensing project) for construction of Gas and Steam Turbine Power Plant |
|
HIDROINŽENIRING, Ljubljana |
Programming of drives in the project scope of regenerator ventilator’s frequency regulation and power supply part of 6kV protection and programming of SCADA system |
|
MIKOMI, Ljubljana, Slovenia |
Project documentation for tower construction for connection of double 110 kV system transmission line for Power Pump Storage Avce |